Sameera Swapan Biswas v. Saroj Sorab Engineer
46 s148-24.doc
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
TRUSHA TUSHAR MOHITE ORDINARY ORIGINAL CIVIL JURISDICTION TRUSHA TUSHAR MOHITE Date: 2025.10.08 18:55:12 +0530 SUIT NO.148 OF 2024 WITH INTERIM APPLICATION NO.1416 OF 2024 Sameera Swapan Biswas .. Plaintiff
Versus
Saroj Sorab Engineer .. Defendant Mr. Murari Madekar with Mr.Sachin Kudalkar i/b M/s.Madekar and Co. Advocate for the Defendant Nos.1 to 3.
CORAM:
FIRDOSH P. POONIWALLA, J.
DATE:
OCTOBER 8, 2025 P. C.
1.
Mentioned out of turn.
2.
The time granted for making payment to the Plaintiff by Defendant Nos.1 to 3 as per the two Minutes of Order, as recorded in the Order dated 22nd August 2025 of R.I.Chagla, J. is extended till 6th November 2025.
3.
Stand over to 6th November 2025.
[FIRDOSH P. POONIWALLA, J.] Mohite 1/1